Forum Discussion
11 years ago
Install question
A week ago Hughes did an install changing me over from DishNet. The modem and the antenna system were change over but the three year old in-ground cabling was not replaced. Should it have been? What a...
11 years ago
Ahhh, a fellow GD worker. I started at Electric Boat in 1963 in Nuclear Quality Control. Retired from their Newport (RI) engineering facility in 1992. I ended up labeled as a troubleshooter and was plopped here and there for about 20 years. Also, I'd burn out, leave to do something else interesting, then return when there was an interesting crisis to solve.
Related Content
- 5 years ago
- 5 years ago
- 5 years ago
- 7 years ago
- 5 years ago