I see in that old gov application for licenses that there are several frequency bands for both upload and download -- perhaps they have so many dishes not just for redundancy, but to split based on frequency band as well as upload/download? I suspect this gateway shown here is serving not just J2, but also some older satellites -- anyway, I can see the aim is different on the dishes, but many dishes of different sizes appear to be aimed at the same thing. I found some other gateways that had fewer dishes.
Having redundancy is good -- getting a little water in a cable without redundancy would cause havoc for a lot of folks on several beams if everything went through a single dish, although I think I saw something about there being a backup gateway setup for each beam should a disaster take out a gateway.
Do you remember when the last time you saw three hops? Maybe it is connected with a gateway upgrade they did at some point? The gateway upgrades earlier this year were fairly noticeable, so I was wondering if maybe what you saw was related to that? I had not thought of logging a traceroute result every week or so to watch for things changing like that.
By the way, what number for your IPGW do you see? I was wondering if other customers see numbers outside of the ranges that I have been seeing since earlier this year -- of course you are a different beam and gateway, but I was curious if the number ranges differ by customer/plan etc.